🍳 Kitchen installation

Kitchen installation — what must be ready before the first cabinet

Brzix · Updated 15 September 2026
Short answer: You need the finished room dimensions, exact water, drain and socket positions, and the model numbers of all appliances. The most expensive improvisations happen when services end up behind a drawer or a worktop is ordered before the walls are checked.

A sensible order of work

Checklist before requesting a quote

InformationWhat to send
KitchenPlan and number of cabinets
RoomMeasurements, angles and photographs
WorktopMaterial, length and cut-outs
AppliancesModel numbers and dimensions
ServicesPositions of water, drain and sockets

Who connects what

A kitchen fitter assembles the cabinets, but water, high-load electrical appliances or gas may require another qualified professional. Clarify silicone sealing, cutting and packaging removal as well.

Checks before handover

Open every drawer and door, and inspect gaps and alignment. Run the water and inspect the connections under the sink. Photograph services before the kitchen conceals them.

Frequently asked questions

Can the kitchen be measured before tiling?

It can be measured for planning, but final dimensions should be confirmed after floors and wall finishes are complete.

Does installation include appliances?

Do not assume so. The quote should specify installation, cut-outs and connections.

What if the wall is not square?

Filler panels and the worktop can be adjusted, but larger deviations require additional work.